A missing scaffold permit, failed inspection, or delayed facade repair can shut down your entire project overnight. 24Seven Sidewalk Shed installs DOB-compliant frame scaffolding across NYC while managing the permits, engineering coordination, and safety requirements that keep your site operational.
We align your project activity to maintain compliance across all five NYC boroughs, from emergency FISP facade stabilization to routine masonry repairs.
Frame scaffolding is a ground-supported access system governed by NYC Building Code §3314. It uses prefabricated steel frames, cross-braces and planking to create a rigid workspace. Depending on the project, we install H-frame, ladder-frame, and narrow-frame systems to accommodate different facade layouts and sidewalk conditions.
This system depends on scaffold frame components like pins, base plates, and diagonal braces to hold the structure together. We pin and secure every connection carefully, whether using a tubular welded frame scaffold or standard steel frame scaffolding. Every load path and tie-in is installed according to RDP-stamped engineering drawings.
BIS inspectors verify the installation against the approved plans during the initial inspection. By following RDP-stamped drawings precisely, we help keep your project moving without unnecessary delays.
We mobilize for GCs and property managers facing emergency regulatory pressure:
Building owners usually ask which access method is more efficient. We assess your site based on the height and staging capacity:
Our team evaluates your building’s frontage and height to recommend the right solution. Contact us to get a quote at (516) 464-1764.
Every scaffold project in NYC comes with a compliance layer. We handle it all, from the initial DOB filing to the final inspection sign-off. Submit your building height and project scope for a written, itemized quote within 24 hours.
Email building height and project scope to contact@24sevensidewalkshed.com. Your itemized quote is sent within 24 hours.
Yes. If the scaffold exceeds 40 feet in height, uses outrigger beams, or carries loads over 75 lbs/sq ft. All permits must be filed through the DOB NOW portal. We handle the full filing process to ensure your site is legal from day one.
Pricing is project-specific, it depends on various factors like height, duration, and the need for a sidewalk shed canopy. We provide itemized and customized quotes so you see exactly where your budget goes.
Frame scaffolding is a modular, prefabricated system (H-frames). It is ideal for standard facade repairs and highly cost-effective. Whereas, pipe (tube-and-clamp) scaffolding is a custom, adjustable system built specifically for complex building architecture.
While the property owner is liable for the building, we act as the Filing Representative. We pull the permits, manage the DOB NOW filings, and coordinate with your Registered Design Professional (RDP), so you don't have to navigate the city’s administrative portal.
Your rental includes the structural steel, safety planking, mandated LED lighting, debris netting, and the labor for erection and dismantling. It also includes all DOB permit filings and the 90-day progress report tracking required by Local Law 48/51.
As per 2026 DOB mandates, most permits are issued in 90-day cycles. We customize our contracts to match your specific facade repair or construction timeline. You stop paying for equipment the moment your project is signed off.
We handle the renewal process. Because permits are now strictly 90-day cycles, we proactively file the required progress reports and pay the $130 renewal fees to keep your site compliant without any lapse in legal status.
Per NYC Building Code §3314.4, every worker on the platform must hold a 16-hour OSHA Site Safety card. For any job exceeding 40 feet, a 32-hour OSHA-certified foreman must be on-site to oversee the work.