Build your action timeline
Two quick inputs to date your plan
The date the QEWI filed the UNSAFE classification with the DOB (on the FISP/TR6 report).
A sidewalk shed is the first and most urgent step after an UNSAFE filing.
30days left
Your 30-day window
Your dated action plan
Don't run the clock alone — we handle the whole response
Emergency shed install · QEWI coordination · DOB filings · All 5 boroughs
Call (516) 464-1764
Disclaimer: This guide provides a general action sequence based on NYC's Facade Inspection Safety Program (FISP / Local Law 11) requirements following an UNSAFE classification. The day targets shown are planning estimates — actual deadlines, including how quickly protection must be installed and repairs commenced, are set by the DOB and depend on the specific condition and filings. This tool is informational only and is not legal advice. Confirm your obligations with your QEWI, the DOB, or a licensed professional.